Thinking about installing solar panels in Manchester but not sure how the process works? A smooth installation depends on working with a certified local installer who handles everything from survey to aftercare.
Here’s a step-by-step breakdown of how Greentech Renewables Manchester installs solar panels for homes and businesses.
🏡 Step 1: Free Consultation & Property Survey
-
Discuss your goals (bill savings, battery storage, EV charging).
-
Installer checks your roof orientation, shading, and structural integrity.
-
You receive a custom quote, including grants and 0% VAT.
👉 Related: Solar Panel Costs in Manchester – 2025 Guide
📐 Step 2: System Design & Proposal
-
A tailored system is designed for your property.
-
Proposal includes:
-
Expected energy generation (kWh/year)
-
Bill savings estimate
-
Payback period calculation
-
Options for battery storage integration
-
📌 Greentech Renewables provides transparent savings projections upfront.
⚡ Step 3: Paperwork & Permissions
-
MCS certification and SEG eligibility ensured.
-
0% VAT automatically applied.
-
Planning permission checked (only required for listed or conservation-area properties).
-
Applications for grants (ECO4, LA Flex) submitted via installer.
👉 Related: How to Apply for Solar Grants in Manchester
🔧 Step 4: Installation Day
-
Most residential installs take 1–2 days.
-
Scaffolding set up (if needed).
-
Solar panels fixed to roof with safe mounting systems.
-
Inverter and cabling installed for connection to the home’s electricity supply.
-
Optional battery installed for storage.
🔌 Step 5: Testing & Grid Connection
-
System tested for performance and safety.
-
Connected to the grid for exporting surplus electricity.
-
Certification issued for Smart Export Guarantee (SEG) payments.
📱 Step 6: Monitoring & Handover
-
Installer sets up your solar monitoring app (track generation & usage in real-time).
-
Full handover with system documentation, warranties, and aftercare instructions.
-
You start saving on bills immediately.
👉 Related: Aftercare & Warranties for Manchester Solar Installations
🌱 Why Work with Greentech Renewables Manchester?
-
Local expertise: Knows Manchester housing and council rules
-
Certified installers: MCS, TrustMark, HIES, NAPIT accredited
-
Full service: Consultation → installation → aftercare
-
Customer satisfaction: 4.9★ rating from 70+ local reviews
👉 Learn more: Greentech Renewables Manchester – Installer Profile
❓ FAQs – Solar Installation Process Manchester
How long does installation take?
1–2 days for most homes. Larger systems may take longer.
Do I need planning permission in Manchester?
Not usually, unless your property is listed or in a conservation area.
Will my electricity be cut off during installation?
Only briefly while connecting the system.
How soon can I start saving money?
Immediately after installation and system activation.
✅ Key Takeaways
-
Solar installation in Manchester is simple with the right installer.
-
Greentech Renewables handles everything: design, paperwork, installation, and aftercare.
-
Most systems are installed in just 1–2 days.
-
Grants, SEG, and 0% VAT are applied seamlessly.
📞 Ready to start your solar journey? Book a free survey with Manchester’s trusted installer today.